Petlink Microchip essay

The new product to be introduced is the petlinc microchip, which allows identifying and tracking pets. The objective of this project is to build and implement a new chip equipped with limited tracking ability. This new chip would allow pet owners to track their pet should they need. Current pet chips can only be scanned not tracked. This new chip would allow pet owners to track their pet, catch animal thieves, and ultimately ease their own mind by knowing exactly where they can find their missing pet.

Since a battery would limit they length of chip operation, it would instead be a sensor, that with a special tracking unit sends a signal throughout a certain radius, which in turn could be picked up with the device allowing owners to track and find their pets.

Project management plan

The first step of the project management plan is designing the product. The designing will include the generation of the idea of the product and creation of the model of the product that may be further tested. The next step is programming that focuses on the elaboration and implementation of the software required for the product. Programming is very important, taking into consideration the fact that the petlink microchip will be a highly technological product and the effectiveness of software determines the overall effectiveness of the product. Furthermore, purchasing is essential for the construction of production facilities and required licenses to launch the production process. The next step is manufacturing, when the production process begins and the company is ready to manufacture the required amount of microchips. Finally, the implementation begins, when the distribution channels and suppliers of materials required for the production of petlink microchip are identified and human resources are recruited.

Project execution

There will be 4 teams working on the project and its specific elements, including design, programming, manufacturing, and testing. These four teams will cooperate and transit the product from one stage to another. The design team will design the product and transmit it to the programming team. The programming team will create the software and install it and test it on the product to transmit the product to the manufacturing. The manufacturing team will manufacture the product, while testing team will complete tests to prove the reliability of the product or find drawbacks that have to be eliminated before the mass production of the microchip.

Monitor and control project and deliverables

            Control officers will conduct monitoring and control over the implementation of the project. They will monitor the implementation of the plan and identify challenges and difficulties the project confronts. They will report those difficulties and problems to the project team, which will take a decision to resolve those problems and keep the project running smoothly.

Project closing

            Project closing comprises an integral part of the project, which involves the completion of the project and the successful introduction of the petlink microchip along with the launch of its mass production. As sales of the new product will start, the project manager should monitor the performance of the new product and its marketing progress. The project closing will occur, when the product shifts toward the stable growth stage to reach the saturation stage in the lifecycle of the product. After that, depending on the marketing performance of the petlink microchip, the project may be measured in terms of its successfulness.